Annual climate summary 2023
The report discusses the climate condition over Indian region during the year 2023. Notably, global temperatures soared to exceptionally high levels during this period (WMO.No.1347). The India Meteorological
The report discusses the climate condition over Indian region during the year 2023. Notably, global temperatures soared to exceptionally high levels during this period (WMO.No.1347). The India Meteorological
At least eight people were killed and nearly 200,000 people have been affected due to torrential rain resulting from the north-east monsoon in the country.
In parts of the world already facing unreliable food supplies, an uncertain climate adds to the future stress for soils, plants and people. March 20, 2008
Water (either from the sky or the irrigation canal) is often a key factor in determining crop yields, squeezing more crop out of the same drop will be central to one of the biggest challenges of this
Several dams in the State are receiving higher inflows in the wake of an un-seasonal rain spell in the southern parts of the State and Karnataka.
Melburnians tossed and turned through the warmest March night on record with the mercury dipping to a balmy minimum of 26.9 degrees just before 7.30am today.
Disaster Management Centre of Sri Lanka said that over 7,000 families have been displaced due to floods. Also, several areas are in danger with landslides, the Centre added.
Shivalik hills of Punjab, Haryana and Himachal Pradesh are among the 107 million hectares in the country worst affected by soil erosion, resulting in continuous and gradual depletion of fertility and
Landslides in Nilgiris are mainly due to rainfall, but human intervention in the form of deforestation and plantation has turned this into a calamity.
Thirty-two sewerage schemes to be completed at a cost of Rs623.706 million in Latifabad, city and Qasimabad Talukas have been approved by the District Nazim of Hyderabad, Kanwar Naveed Jamil. The decision was taken in a meeting held on Thursday at the District Nazim's Secretariat and attended by Chairman District Works and Services Committee Munawar Khanzai; Managing Director Wasa Mohammad Basheer Awan; deputy project directors HDP Kafeel Ahmed and Faheem Akhtar Junejo, and XENs. District Nazim directed the agencies to complete the schemes before monsoon and connect them with the expanded sewerage system. He ordered immediate beginning of work on the schemes. He said the district government in last two years spent billions of rupees to overcome sewerage problems which had haunted people for last so many years. The entire system was streamlined and modernised after construction of new pumping stations in three city Talukas, increasing capacity of the existing, and laying sewerage lines of bigger diameter, he said and added: "The approved schemes will be connected to new system to drain out rain water during rains.' The sewerage schemes approved were 17 for Latifabad Taluka and seven each for city and Qasimabad talukas which include laying of 12-inch diameter rising main from Thandi Sarak pumping station up to GOR Colony culvert which will cost Rs3 million. District Nazim also gave details of each new scheme in three talukas with an exact cost of each.