Clean up actions
• Finalisation of master plan of Udaipur city, setting apart adequate areas for construction of hotels and prohibiting new construction within 200m of the lakes.
• Diversion of all sewage and waste water from the lakes to a fully functional sewage system, which has one or more sewage treatment plants.
• Construction of a chain of toilet complexes around the lakes, the use of which should be made free.
• Construction of separate washing and bathing facilities away from the lakes.
• Disposal of solid wastes, including conversion into compost or bio-conversion using vermiculture technology, on a permanent basis.
• Massive afforestation and construction of silt traps and anicuts in the catchment areas of the lakes.
Related Content
- Order of the National Green Tribunal regarding encroachment of a waterbody in Gram Panchayat Dadri, district Meerut, Uttar Pradesh, 01/04/2025
- Report by National Mission for Clean Ganga (NMCG) on the steps taken to arrest the deteriorating water quality of river Ganga in Bihar, 17/03/2025
- Order of the National Green Tribunal regarding supply of safe and clean drinking water to areas affected by Guillain Barre Syndrome (GBS) disease, Pune, Maharashtra, 06/03/2025
- Order of the National Green Tribunal regarding open defecation during Maha Kumbh in Prayagraj, Uttar Pradesh, 24/02/2025
- Report by the Tamil Nadu Pollution Control Board on cleaning of Buckingham canal, 19/02/2025
- Order of the National Green Tribunal regarding floating hotel in Tehri Lake, 10/02/2025