Mega Narayanguri dyke brings ray of hope
The reconstruction of Naryanguri dyke is going on in full swing bringing ray of hope to the people of that area especially those affected by floods in Barpeta and Baksa district. The construction which started in February 3, 2008 would be completed in March. The Narayanguri dyke was washed away in 2004 by the strong currents of Beki river which was overflooded due to the release of excess water of Kurisshu dam by the Royal Government of Bhutan. As a result Beki river changed its original course and flowed through Kalpani and Palla causing havoc in a number of villages. That year, though the dyke was repaired costing more than Rs 3 crore, the quality of work was poor and it collapsed on July 31, 2007. Since then about Rs 1.5 lakh people in Barpeta and Baksa district has been suffering from floods. On December last year the reconstruction work was formally inaugurated by BTAD chief Hagrama Mohilary, assuring quality work this time. An official with the Water Resource Department informed that the structure of the bundh will be the stronger this time. Depending upon the depth of the water,