Razings required in corridor
A day before the review meeting for the under-construction Bus Rapid Transit (BRT) corridor, Times City took a drive from Moolchand to Delhi Gate only to find that the part of the corridor which has already been constructed as per the earlier design will have to be razed for trials to begin. After the Moolchand crossing, lane segregation has been completed till CGO complex in accordance with the design of Pilot A.