An irrigation project full of leakes
Lack of proper investigations, detailed study of hydrology and detailed command area survey prior to the finalisation of original estimate of Rs. 140 crores in 1985 has led to change in the scope and
Lack of proper investigations, detailed study of hydrology and detailed command area survey prior to the finalisation of original estimate of Rs. 140 crores in 1985 has led to change in the scope and