Renewable capacity statistics 2021
The International Renewable Energy Agency (IRENA) produces comprehensive statistics on a range of topics related to renewable energy. This publication presents renewable power generation capacity statistics
The International Renewable Energy Agency (IRENA) produces comprehensive statistics on a range of topics related to renewable energy. This publication presents renewable power generation capacity statistics
For many years, offshore wind was the expensive cousin of onshore wind with generation costs in the range of $150 to $200 per megawatt hour (MWh). This changed dramatically between 2016 and 2017 when a
<p>India is blessed with abundant sources of renewable energy and by March 2019 about 77.6 GW RE based capacity has already been installed in the country along with45.4GW of large hydro capacity. Out of
This brief demonstrates that the energy transition in the countries in which energy demand is accelerating is constrained by availability and affordability of finance. It examines the demand for capital
The Rajasthan government has released a draft of new hybrid policy titled, ‘Rajasthan Wind and Wind-Solar Hybrid Policy, 2019’. The largest state in the country, Rajasthan has come up with a draft of the
The Andhra Pradesh Government’s move to review and bring down the purchase cost of wind and solar energy could aggravate the problem of delayed payments from distribution companies. This could lead
This technical guide is the first in a series of four technical guides on variable renewable energy (VRE) grid integration produced by the Energy Sector Management Assistance Program (ESMAP) of the World
MUMBAI: Debt-laden Suzlon Energy said it defaulted on a $172-million bond payment on Tuesday, as sources aware of the matter said the wind power equipment maker was in talks with several global private
Of the target of 175 gw, the government wants to have 100 gw of solar and 60 gw of wind energy The installation of renewable energy in India has crossed 80 gigawatt (gw), against the government target
This report discusses the issues that impede the development of wind energy in India and undertakes a systematic analysis to propose pathways and interventions to achieve the national target. Wind energy
The Guidelines for Tariff Based Competitive Bidding Process for Procurement of Power from Grid Connected Wind Power Projects was notified on 8th December, 2017. Based on experience of bidding and after